PRJ: Resource Graph: Show Availability Line Unavailable (96120)



The information in this article applies to:

  • Microsoft Project 98 for Windows
  • Microsoft Project for Windows 95 4.1
  • Microsoft Project for Windows 95 4.1a
  • Microsoft Project for Windows 3.0
  • Microsoft Project for Windows 3.0a
  • Microsoft Project for Windows 4.0
  • Microsoft Project for the Macintosh 3.0
  • Microsoft Project for the Macintosh 4.0

This article was previously published under Q96120

SUMMARY

If you select Bar Styles from the Format menu in Resource Graph view, the Show Availability Line check box appears. This option is only available if you are using one of the following formats:

Peak Units
Work
Availability
Percent Allocation

This option is unavailable when you are using the Cumulative Work, Overallocation, Cost, or Cumulative Cost format.

REFERENCES

Microsoft Project User's Reference

Modification Type:MajorLast Reviewed:11/25/2003
Keywords:kbinfo kbusage KB96120