How the values in the Status box, in the Priority box, and in the Duration box are affected when you remove a subtask from a summary task in the "Task Manager" tool in Groove (916478)
The information in this article applies to:
- Groove Workspace 2.5 Preview Edition
- Groove Workspace 2.5 Professional Edition
- Groove Workspace 2.5 Project Edition
- Groove Virtual Office 3.0 Professional Edition
- Groove Virtual Office 3.0 Project Edition
- Groove Virtual Office 3.0 Trial Edition
- Groove Virtual Office 3.1 Professional Edition
- Groove Virtual Office 3.1 Project Edition
- Groove Virtual Office 3.1 Trial Edition
INTRODUCTION If you remove a subtask from a summary task in the
Task Manager tool, the values that are in the following boxes of the former summary
task remain the same: - The Status box
- The Priority box
- The Duration box
However, if you add a task to a summary task in the Tool Manager tool, the values for all three of these boxes are recomputed.