Description of the Microsoft Office Project 2003 post-Service Pack 1 hotfix package: August 25, 2004 (841361)



The information in this article applies to:

  • Microsoft Office Project Professional 2003
  • Microsoft Office Project Standard 2003

SUMMARY

Microsoft has released Microsoft Office Project 2003 post-Service Pack 1 hotfix package for Microsoft Office Project 2003. This article describes the following items about the hotfix package:

  • Issues that the hotfix package fixes
  • Prerequisites for installing the hotfix package
  • Whether you must restart your computer after you install the hotfix package
  • Whether the hotfix package is replaced by any other hotfix package
  • Whether you must make any registry changes to use one or more of the hotfixes in the package
  • The files that the hotfix package contains

SUMMARY

This article describes the Microsoft Office Project 2003 issues that are fixed in the Microsoft Office Project 2003 hotfix package that is dated August 25, 2004.

back to the top

Issues that are fixed in the hotfix package

The following issues are fixed in this hotfix package:
  • 840376 Actual Work that is submitted by the local resources may be lost when you synchronize a project that uses Protected Actuals and local resources in Project 2003

  • 843608 How to let Project Professional 2003 connect to your Project Server that is located in the intranet zone without being prompted to add the Project Server as a trusted site

  • 883505 Actual Work Protected values for assignments that are in a Resource view may be blank or display a zero for their values in Project Professional 2003

The following issues are also fixed in this hotfix package, but they were not previously documented in a Microsoft Knowledge Base article:
  • When you synchronize a project plan that uses Protected Actuals in Project 2003, the data that is in the Work field may increase for individual tasks and for Project Summary tasks every time that you synchronize your project plan.
  • When you use the Define working times for resources option in the Project Guide, Project 2003 may stop responding if you change the working times after you check out a resource from the Enterprise Resource Pool.
  • If you assign yourself to a task in Microsoft Project Web Access (PWA), a duplicate task may be created. Additionally, any one of the following symptoms may occur:
    • When the project manager accepts your submitted timesheet in PWA, the project manager receives one of the following error messages:
      Some approved task changes cannot be updated in Project files. Click view details for more information. If you rejected a task, the resource has been notified by e-mail. Please save your Project files with new updates. The updated tasks will remain in the table until you save the project files.

      The following projects were not updated correctly for the following reasons:

      1. ProjectFileName: Some of the tasks in this project failed to update. The specific errors will show up individually inside of Project.
      Some approved task changes cannot be updated in Project files. Click view details for more information. If you rejected a task, the resource has been notified by e-mail. Please save your Project files with new updates. The updated tasks will remain in the table until you save the project files.

      The following projects were not updated correctly for the following reasons:

      1. Duplicate Assignment: Unknown Error.
    • When the project manager accepts your submitted timesheet in Microsoft Office Project Professional 2003, the project manager receives the following error message:
      Microsoft Office Project

      The resource assignment cannot be updated because the resource "" is no longer assigned to task "taskname".

      Try one of the following:
      -You may be updating actuals on a new task created by the resource. In this case, update the new task to Project prior to updating its update information.
      -The resource may have been removed from the task before you received the updated information you are trying to incorporate.
      -The task you are trying to update may have been deleted from your project.
      -If you are updating a project that is inserted into another project, expand the project, and then try again.
    • When the project manager republishes the project plan in Project Professional 2003, the project manager receive one of the following spooler error messages:
      SYSTEM ERROR (0x80004005)
      DATABASE ERROR (0x80040E14)
  • After you repeatedly save a baseline and your project plan in Project Professional 2003 as the project manager, the baseline data is incorrect when you reopen and view your project plan in the Resource Usage view.
  • When you make changes to an enterprise custom field in your Master Project File in Project 2003, enterprise custom field values that are contained in a task may be blank.
  • If you rename custom fields in Project Professional 2003 and then import a Microsoft Excel workbook as a new project, the renamed custom field names are missing in your new project.
  • Every time that you synchronize your Protected Actuals in a project plan that contains a managed time period and a material resource that contains submitted actual hours worked, the values that are in the % Complete field, in the Actual Work field, and in the Actual Duration field change.
  • Every time that you synchronize your Protected Actuals in a project plan, the value that is in the Actual Duration field increases. This issue may occur even after you install the hotfix that is described in the following article in the Microsoft Knowledge Base:

    839631 Microsoft Office Project 2003 hotfix package: April 1, 2004

  • When you synchronize a project plan that uses Protected Actuals in Project Professional 2003, the values that are in the Work field, the Actual Work field, and the Remaining Work field may change. This issue may occur even after you install the hotfix that is described in the following article in the Microsoft Knowledge Base:

    839631 Microsoft Office Project 2003 hotfix package: April 1, 2004

  • When you try to save your project plan in Project Professional 2003, you may receive the following error message:
    Microsoft Office Project has encountered a problem and needs to close. We are sorry for the inconvenience.

    To see what data this error report contains, click here.
    When you view the data in the error report, the report contains an error signature that is similar to the following error signature:
       Application name  Application version  Module name   Module version  Offset
       -----------------------------------------------------------------------------
       Winproj.exe       11.0.2003.816        Pj11od11.dll  11.0.2003.816   0000729c
    
  • When you close your Master Project Plan in Project Professional 2003 and then click to save your sub projects, Project Professional 2003 may quit unexpectedly, and you receive the following error message:
    Microsoft Office Project has encountered a problem and needs to close. We are sorry for the inconvenience.

    To see what data this error report contains, click here.
    When you view the data in the error report, the report contains an error signature that is similar to the following error signature:
       Application name  Application version  Module name  Module version  Offset
       ----------------------------------------------------------------------------
       Winproj.exe       11.0.2004.401        Winproj.exe  11.0.2004.401   00180c18
    
  • When Project 2003 calculates the BCWP of a task, of a resource, or of an assignment in the Task Usage view, an incorrect earned value is calculated.
  • When you export data from Project 2003 by using the Analyze Timescaled Data Wizard, the value that is in the Baseline Cost field may appear incorrect on the Microsoft Excel worksheet.
back to the top

MORE INFORMATION

Hotfix information

A supported hotfix is now available from Microsoft, but it is only intended to correct the problem that is described in this article. Only apply it to systems that are experiencing this specific problem. This hotfix may receive additional testing. Therefore, if you are not severely affected by this problem, we recommend that you wait for the next Microsoft Office Project 2003 service pack that contains this hotfix.

To resolve this problem immediately, contact Microsoft Product Support Services to obtain the hotfix. For a complete list of Microsoft Product Support Services telephone numbers and information about support costs, visit the following Microsoft Web site:Note In special cases, charges that are ordinarily incurred for support calls may be canceled if a Microsoft Support Professional determines that a specific update will resolve your problem. The usual support costs will apply to additional support questions and issues that do not qualify for the specific update in question.

back to the top

Prerequisites

There are no prerequisites for installing this hotfix.

back to the top

Restart information

You do not have to restart your computer after you apply this hotfix.

back to the top

Hotfix replacement information

This hotfix is replaced by a later hotfix.

For more information, click the following article number to view the article in the Microsoft Knowledge Base:

885833 Description of the Microsoft Office Project 2003 post-Service Pack 1 Hotfix Package: September 18, 2004



back to the top

Registry information

You must create or modify a registry key to use one of the hotfixes that this package contains.

For more information about the registry key, click the following article number to view the article in the Microsoft Knowledge Base:

843608 How to let Project Professional 2003 connect to your Project Server that is located in the intranet zone without being prompted to add the Project Server as a trusted site

back to the top

Hotfix file information

This hotfix contains only those files that you must have to correct the issues that this article lists. This hotfix may not contain all the files that you must have to fully update a product to the latest build.

The global version of this hotfix has the file attributes (or later file attributes) that are listed in the following table. The dates and times for these files are listed in Coordinated Universal Time (UTC). When you view the file information, it is converted to local time. To find the difference between UTC and local time, use the Time Zone tab in the Date and Time tool in Control Panel.

Download information.
   Date         Time   Version         Size       File name
   --------------------------------------------------------------------------------
   25-Aug-2004  23:10  11.0.2004.6825  4,452,072  Project2003-kb841361-fullfile.exe 
Microsoft Windows Installer .msp file information.
   Date         Time   Size       File name
   ----------------------------------------------------------------
   25-Aug-2004  23:09  4,960,768  Project2003-kb841361-fullfile.msp
After you install the hotfix, the global version of this hotfix has the file attributes (or a later version) that are listed in the following table:
   Date         Time   Version         Size        File name
   ------------------------------------------------------------
   25-Aug-2004  23:00  11.2004.0.726      719,720  Anlyzts.dll      
   25-Aug-2004  23:01  11.1.2004.1813     924,536  Pj11od11.dll     
   25-Aug-2004  23:03  11.1.2004.1813     265,472  Pj11tm11.dll     
   25-Aug-2004  23:04  11.1.2004.1825  11,307,864  Winproj.exe
Note For more information about how to install this hotfix, see the Readme.txt file that is included in the package.

back to the top

REFERENCES

For more information about the terminology that Microsoft uses when correcting software after it is released, click the following article number to view the article in the Microsoft Knowledge Base:

824684 Description of the standard terminology that is used to describe Microsoft software updates

back to the top

Modification Type:MajorLast Reviewed:4/7/2006
Keywords:kbQFE KBHotfixServer kbProject2003PreSP2fix kbfix kbHotfixRollup kbBug KB841361 kbAudITPRO kbAudEndUser