The Orchestration Designer incorrectly permits you to compensate a scope by using multiple Compensation shapes in BizTalk Server 2004 (836466)
The information in this article applies to:
- Microsoft BizTalk Server 2004 Developer Edition
- Microsoft BizTalk Server 2004 Enterprise Edition
- Microsoft BizTalk Server 2004 Partner Edition
- Microsoft BizTalk Server 2004 Standard Edition
SYMPTOMSWhen you create an orchestration for your Microsoft BizTalk
Server 2004 project, the Orchestration Designer interface in BizTalk Server
permits you to add more than one Compensation shape to a Scope shape.
In this scenario, you can assign the same transaction identifier to
the Compensation property value of multiple Compensation shapes. WORKAROUNDTo work around this problem, if you have already compensated a scope in its compensation block, do not compensate that scope again in the same
block.STATUSMicrosoft
has confirmed that this is a problem in the Microsoft products that are listed
in the "Applies to" section of this article.
Modification Type: | Major | Last Reviewed: | 2/23/2004 |
---|
Keywords: | kbpending kbBug kbBTSOrchestration KB836466 kbAudDeveloper |
---|
|