SMS: Advertisements Set for Next Logon Run Immediately if Another Advertisement Runs Before Next Logon (306511)
The information in this article applies to:
- Microsoft Systems Management Server 2.0
- Microsoft Systems Management Server 2.0 SP1
- Microsoft Systems Management Server 2.0 SP2
- Microsoft Systems Management Server 2.0 SP3
This article was previously published under Q306511 SYMPTOMS
If you schedule an advertisement for a package with a dependency and the advertisement is scheduled to run at the next logon, this process works correctly. However, if before the next logon, another advertisement (which might be totally unrelated to the first advertisement) is sent to the same computer and is started before the first advertisement starts (because the computer has not yet been restarted), the second advertisement runs normally. After this occurs, the advertisement that is scheduled for the next logon will incorrectly start even though a new logon has not yet happened. This occurs even though advertisements should run according to the schedule that is set when the advertisement is configured.
CAUSE
This problem is caused by the trigger list for Advertised Program Manager being incorrectly re-evaluated when the second advertisement starts.
STATUSMicrosoft has confirmed that this is a problem in the Microsoft products that are listed at the beginning of this article.
Modification Type: | Minor | Last Reviewed: | 6/14/2005 |
---|
Keywords: | kbBug kbenv kbui KB306511 |
---|
|