FIX: Orchestration Designer Stops Responding at the End of the COM Component Wizard (303539)



The information in this article applies to:

  • Microsoft BizTalk Server 2000

This article was previously published under Q303539

SYMPTOMS

When you use the BizTalk Server 2000 Orchestration Designer to bind a COM object to a schedule, the Orchestration Designer may stop responding (hang) when the binding wizard completes.

NOTE: This problem only seems to occur with the French versions of Microsoft Windows 2000, Microsoft Visio 2002, and BizTalk Server 2000.

CAUSE

The identifier for the inch unit of measurement is specified as "in." However, it should be specified as "IN" in the Orchestration Designer to represent the Visio universal string for the unit of measure "inch."

RESOLUTION

To resolve this problem, obtain the latest service pack for Microsoft BizTalk Server 2000. For additional information, click the following article number to view the article in the Microsoft Knowledge Base:

299664 INFO: How to Obtain the Latest BizTalk Server 2000 Service Pack

STATUS

Microsoft has confirmed that this is a problem in BizTalk Server 2000. This problem was first corrected in Microsoft BizTalk Server 2000 Service Pack 1a.

Modification Type:MajorLast Reviewed:11/5/2003
Keywords:kbBizTalk2000SP1afix kbfix kbprb KB303539