Visio5: The Visio 5.0 Project Timeline Wizard Does Not Interpret "m" as Months (254612)
The information in this article applies to:
- Microsoft Visio Standard 5.0
- Microsoft Visio Professional 5.0
- Microsoft Visio Technical 5.0
- Microsoft Visio Enterprise 5.0
This article was previously published under Q254612 SYMPTOMS
According to Visio 5.0 Help, you can use the abbreviation "m" to specify a duration of months in an external data file that you create to use with the Project Timeline Wizard. However, the wizard was designed to read "m" as minutes.
NOTE: A data file can be a Microsoft Excel (XLS), Microsoft Project Exchange (MPX), or comma- or tab-delimited text (TXT) file.
RESOLUTION
To create a timeline that shows a duration of one or more months, use the "w" (weeks) abbreviation instead. For example, to specify one month, type 4w in the data file.