12293 Connection Errors Occur when SQL Server Priority Boost Is Changed (229019)
The information in this article applies to:
- Microsoft Site Server 3.0 Commerce Edition
This article was previously published under Q229019 SYMPTOMS
The following event may populate the application event log of Site Server 3.0 Commerce servers if the priority boost setting in SQL Server 6.5 has been modified from its default setting of 0:
12293
Commerce
Error
Commerce Server
Commerce Server: Connection Error:
WORKAROUND
If the error listed above occurs, change the priority boost setting to the default of 0.
Modification Type: | Major | Last Reviewed: | 6/29/2004 |
---|
Keywords: | kbprb KB229019 |
---|
|