ACC2000: Access C/S Does Not Display Full Results with COMPUTE (199137)
The information in this article applies to:
This article was previously published under Q199137 Advanced: Requires expert coding, interoperability, and multiuser skills.
This article applies only to a Microsoft Access project (.adp).
SYMPTOMS
When you run a stored procedure that contains COMPUTE / COMPUTE BY, in a
Microsoft Access project, the results are truncated.
RESOLUTION
To display sums, use a Microsoft Access report instead.
For additional information about using sums in reports, please see the following articles in the Microsoft Knowledge Base:
208850 ACC2000: How to Sum a Calculation in a Report
STATUSMicrosoft has confirmed that this is a problem in the Microsoft products that are listed at the beginning of this article.
Modification Type: | Major | Last Reviewed: | 6/29/2004 |
---|
Keywords: | kbbug KbClientServer kbpending KB199137 |
---|
|