PU Passthru Connection Fails To Activate During XID Negotiation (196193)



The information in this article applies to:

  • Microsoft SNA Server 4.0 SP1

This article was previously published under Q196193

SYMPTOMS

PU Passthru connections to a remote end may stay in a pending status and not be able to reactivate.

CAUSE

When you use PU Passthru with Distributed Link Services, a window exists whereby one of the remote ends can send an XID to the Node after the Node has sent it the Open-Station-Request. This caused the Node to reject the Open-Station-Response and Station-Contacted message, and thus fail to activate either of the PU Passthru Connections.

RESOLUTION

Microsoft has confirmed this to be a problem in SNA Server version 4.0 Service Pack 1. This problem was corrected in the latest SNA Server version 4.0 U.S. Service Pack. For information on obtaining this Service Pack, query on the following word in the Microsoft Knowledge Base (without the spaces):

S E R V P A C K


Modification Type:MinorLast Reviewed:1/16/2004
Keywords:kbbug kbfix KB196193