FP98: Task Added from To Do List Not Linked to Page (194428)
The information in this article applies to:
- Microsoft FrontPage 98 for Windows
This article was previously published under Q194428 For a Microsoft FrontPage 97 and earlier version of this article, see 152388.
SYMPTOMS
When you click Add in the FrontPage To Do List dialog box in either
FrontPage Editor or FrontPage Explorer, a link to the current page is not
created for the task.
STATUSMicrosoft has confirmed that this is a problem in the Microsoft products that are listed at the beginning of this article. MORE INFORMATION
This feature is desirable if you want to avoid a page link. For example,
you might use this feature when you want to add a task that is not related
to a specific page.
WORKAROUND
To add a Task to the To Do List with a link to a specific page, follow
these steps:
- In FrontPage Explorer or FrontPage Editor, click Add To Do Task on
the Edit menu.
- Type a Task Name, Description, select a priority, and then click
OK.
In the FrontPage To Do List, the new task will be linked to a specific
page.
Modification Type: | Major | Last Reviewed: | 10/3/2001 |
---|
Keywords: | kbbug KB194428 |
---|
|