PRJ98: Work and Baseline Work Do Not Match After Saving Baseline (186071)
The information in this article applies to:
- Microsoft Project 98 for Windows
This article was previously published under Q186071 SYMPTOMS
In Microsoft Project 98, after saving a baseline, when you view the Task
Usage or Resource Usage view, timephased Baseline Work values might not be
the same as timephased Work values.
NOTE: There may also be timephased Baseline Work values of zero after the task Finish date.
CAUSE
This problem may occur when all of the following conditions are true:
- A resource is assigned to a task.
- The resource assignment on that task has a contour other than a Flat
contour.
- You have saved a baseline.
RESOLUTION
To correct this problem, install Microsoft Project 98 for Windows Service
Release 1 (SR-1).
STATUSMicrosoft has confirmed that this is a problem in the Microsoft products that are listed at the beginning of this article.
This problem was corrected in Microsoft Project 98 for Windows, Service
Release 1 (SR-1).
For additional information about obtaining and installing SR-1, click the
article number below to view the article in the Microsoft Knowledge Base:
185102
PRJ98: How to Obtain and Install MS Project 98 SR-1
Modification Type: | Major | Last Reviewed: | 10/17/2002 |
---|
Keywords: | kbbug KB186071 |
---|
|