169235 PRJ98: Invalid Page Fault with Microsoft Windows Printing System
173169 PRJ98: Microsoft Project Takes a Long Time to Save Baseline
173747 PRJ98: Notes Field Truncated when Using Notes Property in Macro
174357 PRJ98: Project Stops Responding when Saving File
174358 PRJ98: Project Stops Responding when Resource Deleted
174368 PRJ98: Project Stops Responding Saving Baseline or Interim Plan
174370 PRJ98: Project Stops Responding Saving Baseline in PERT View
174734 PRJ98: MS Project Stops Responding with Resource Work Contour
175009 PRJ98: Early Timephased Actual Cost not Reflected in Total ACWP
175031 PRJ98: Incorrect Work Value in Usage Views for In-Progress Tasks
176308 PRJ98: Duration Changes If Task Split Is Moved
176309 PRJ98: Total BCWP May Not Show Correct Timephased BCWP
176310 PRJ98: Invalid Page Fault, Hang Sending Routing Slip
177020 PRJ98: Notes Overwrite Footer when Printing Task Report
177021 PRJ98: Out of Memory Error When Previewing, Printing a Report
177022 PRJ98: Task Delay Unexpectedly Added when Adding Leveling Delay
177023 PRJ98: Project Stops Responding After Closing File
177024 PRJ98: Microsoft Project Stops Responding Creating New Calendar
177025 PRJ98: Setup.wri has Wrong Steps for Workgroup Message Handler
177477 PRJ98: Project Stops Responding If Task Have Modified Baseline
177478 PRJ98: Changing Fixed Work Tasks Duration Results in Wrong Value
177520 PRJ98: Problems Printing If Print Scaling Less Than 100 Percent
178185 PRJ: Removing All Resources From Task Removes All Work
178370 PRJ98: Project Stops Responding When Formatting a Bar
178371 PRJ98: Bar Styles Based on Flag Fields May Not Display Correctly
178387 PRJ98: Error Saving a Project to SQL Database
178394 PRJ98: Project Stops Responding When Pasting a Resource
178396 PRJ98: Project Stops Responding or Missing Characters Saving MPX
178678 PRJ98: Resource Time-Phased SV Does Not Equal Resource Total SV
178685 PRJ98: Setup Error: Setup could not find the file...MSSP232.dll
178695 PRJ98:Baseline Cost and Timescaled BCWS Appear as Negative Value
179790 PRJ98: Entering a Cost for a Resource Assignment Results in Zero
179792 PRJ98: Need Team Manager SR-1 to Get Timephased Workgroup Data
180291 PRJ98: Task Split in a Project Created in an Earlier Version
180294 PRJ98: Project Stops Responding When Closing a Consolidated File
180914 PRJ98: Cost Field Value Is Less Than Expected Value
180923 PRJ98: Additional Tasks, Links, Assignments When Pasting Tasks
182895 PRJ98: Unexpected Assignment Sort Order When Project Exported
183454 PRJ98: Project Stops Responding When Opening a Project
183455 PRJ98: Missing Fields When Opening a Project in the MPX Format
183456 PRJ98: Error Entering Number with Space as Thousands Separator
183457 PRJ98: Shortcut Removed After Reinstalling Project
183458 PRJ98: Project Stops Responding When Sharing Resources
183459 PRJ98: Circular Reference Error When Dragging Task
183460 PRJ98: Summary Task Displays Incorrect Percent Complete
184002 PRJ98: Missing Tasks When Print or Print Preview Calendar View
184003 PRJ98: Incorrect Resource Work Value After Undo Deleting Task
184004 PRJ98: Timescale Displayed Incorrectly in Usage Views
184005 PRJ98: Resource Initials Change After Using Resource Info Dialog
184607 PRJ98: Not a Valid Field Name Error When Changing Calendar
184610 PRJ98: Incorrect Resource Work Contour on Fixed Work Task
184611 PRJ98: Copied Project Tasks Do Not Appear in Outlook Task List
184612 PRJ98: Flashing Screen or Endless Alert When Linking Tasks
184613 PRJ98: Periodic Resource Report Shows Incorrect Tasks
184614 PRJ98: Error Message When Pasting Summary Task or Recurring Task
184671 PRJ98: Unexpected Leveling Delay for Tasks with SNET Constraint
184672 PRJ98: Setup.wri Lists Incorrect Command Line Switches for Setup
184673 PRJ98: Project Stops Responding Updating OLE Links from Word
184688 PRJ98: Unexpected Start, Finish, Hours Per Day or Hours Per Week
184689 PRJ98: Unexpected Behavior When Change Percent Complete To Zero
184708 PRJ98: Missing Baseline or Earned Value Info in Usage View
184709 PRJ98: Crash When Saving a Project to Network
185102 PRJ98: How to Obtain and Install Microsoft Project 98 SR-1
185103 PRJ98: List of Fixes in Microsoft Project 98 SR-1
185104 PRJ98: MS Project 98 SR-1 CD-ROM Contents Part 1 of 2
185105 PRJ98: MS Project 98 SR-1 CD-ROM Contents Part 2 of 2
185285 PRJ98: Summary Task Cost and Work Not Displayed in Reports
185286 PRJ98: Cannot Resolve Overallocation Error Message When Leveling
185287 PRJ98: Unexpected Characters in Task Usage Printout or Picture
185293 PRJ98: Incorrect Timephased Baseline Cost in Usage View
185296 PRJ98: Paste Operation Cannot Be Completed Error Opening a File
185297 PRJ98: Resources Not Removed When You Stop Resource Sharing
185298 PRJ98: Project Stops Responding or Crashes When Linking Tasks
185299 PRJ98: Crash When Print or Preview a Gantt Chart with Many Tasks
185484 PRJ98: Total Cost Different from Edited Timephased Actual Cost
185485 PRJ98: Not Enough Memory Error or Crash When Saving Baseline
185838 PRJ98: Crash When Clicking a Date in a Calendar Control
185877 PRJ98: Crash If Selecting Calendar in Change Working Time Dialog
186071 PRJ98: Work and Baseline Work Do Not Match After Saving Baseline
186072 PRJ98: Usage Views Print Timescale Data in Wrong Cells
186076 PRJ98: Project Crashes When You Apply the PERT Chart View
186090 PRJ98: Crash When You Display the Assign Resources Dialog Box
186093 PRJ98: Project Crashes When You Paste Tasks or Resources
186199 PRJ98: TeamUpdate Not Allowed When Resource Removed from Task
187372 PRJ98: Can't Resolve Overallocation If Leveling Minute-By-Minute
187373 PRJ98: File Size Greatly Increases After Saving Baseline
187374 PRJ98: Indicator Column Displays Inserted Project Is Not Valid
187387 PRJ98: Crash When Saving Workspace with Read-Only Resource Pool
187388 PRJ98: Header, Footer, and Legend Missing Opening Template File
187389 PRJ98: Project Stops Responding When Applying AutoFilter
187390 PRJ98: Resources Printed with Incorrect Tasks in Report
188783 PRJ98: Leveling Week by Week Gives Unnecessary Delay and Splits
188798 PRJ98: Crash When Starting MS Project from Another Program
188799 PRJ98: Timephased Percent Complete Recalculated When Entered
188816 PRJ98: AutoFilter Shows Wrong Tasks Using Next Month AutoFilter
188818 PRJ98: Gantt Chart Task Bars Print Incorrectly on First Page
188836 PRJ98: Timephased Costs Assigned at Start of Assignment
189227 PRJ98: Task Outline Level Not Displayed in Internet Explorer 4
189230 PRJ98: Project Stops Responding When Clicking Working Time Tab
189231 PRJ98: Crash or Memory Error When Opening a Consolidated Project
189233 PRJ98: Crash When Print or Print Preview a Report
189246 PRJ98: Resource May Be Replaced After Updating Resource Pool
189247 PRJ98:Updated %Complete & BCWP All in First Period of Task Usage
189813 PRJ98: Timephased BCWP May Be Incorrect in the Task Usage View
189878 PRJ98: Resource Peak Units May Be Displayed Incorrectly
189898 PRJ98: Task May Have Incorrect Predecessor or Successor
189899 PRJ98: Crash When Opening Project Edited in Database
189901 PRJ98: Can Not Open or Edit MS Project 4.x Embedded Object
189903 PRJ98: Updated Online Users Guide For Project 98
190147 PRJ98: Project Crashes When Renaming an Item in the Organizer
190578 PRJ98: Total in Peak Field Greater than Timephased Peak Units
190579 PRJ98: Gantt Bar Missing And Wrong Duration When Assign Resource
190596 PRJ98: Errors Using Microsoft Project Online User's Guide
190597 PRJ98: Error Assigning Resource to Fixed Duration Task
191231 PRJ98: Consolidated Project Opens with Inserted Projects Slowly
191233 PRJ98: Project Stops Responding After Changing Task Actual Work
191393 PRJ98: VBA: Excess Memory Consumed When Running Macro
191399 PRJ98: Inserting Unlinked Projects May Cause Crash
191402 PRJ98: Incorrect Row Height After Collapsing Outline
192022 PRJ98: Columns Overlap When HTML Viewed in Netscape Navigator
192026 PRJ98: Analyze_Timescaled_Data Macro Produces Incorrect Values
192390 PRJ98: Error Inserting Project Containing Inserted Subprojects
193044 PRJ98: Projects Connected to Resource Pool Slow to Open
193149 PRJ98: Changing % Complete Reschedules Split Task Incorrectly