PRJ41: Summary List of Fixed Bugs in MS Project Version 4.1a (155398)



The information in this article applies to:

  • Microsoft Project for Windows 95 4.1
  • Microsoft Project for Windows 95 4.1a

This article was previously published under Q155398
The following table lists problems fixed in Microsoft Project version 4.1a. This is current as of 8/96, but it is not a comprehensive list . For more information about each issue, query in the Microsoft Knowledge Base on the article identifier (ID).

Summary List for Microsoft Project Version 4.1a

Article IDArticle Title
155244PRJ41: MS Project 4.1 Will Not Run On Windows NT 4.0
137846PRJ41: Can't Change Paper Size Running Under Windows NT
155239PRJ41: Cannot save to SQL version 6.5
145573OFF7: Post To Exchange Folder Command Fails
148360PRJ41: Negative Numbers Converted to Positive with Save To Database
145853PRJ: Using Format/Bar May Cause Bad Formatting to Appear
155159PRJ41: Resource Calendar Ignores Base Calendar Exceptions
155238PRJ41: Updating Project With Workgroup Message Hangs WOW
155247PRJ41: Wrong Variance Costs Between $21,474,837 and $42,949,017
155260PRJ41: Many Direct Cell Formats May Cause Hang
155264PRJ41: Resource Reports Which Use a Filter May Crash
155335PRJ: How to Configure Microsoft Project Workgroup Messaging with Lotus Notes
155332PRJ41: Cannot Save a File Back to The Same Database

Modification Type:MajorLast Reviewed:9/26/2003