PRJ41: Summary List of Fixed Bugs in MS Project Version 4.1a (155398)
The information in this article applies to:
- Microsoft Project for Windows 95 4.1
- Microsoft Project for Windows 95 4.1a
This article was previously published under Q155398
The following table lists problems fixed in Microsoft Project version 4.1a.
This is current as of 8/96, but it is not a comprehensive list . For more
information about each issue, query in the Microsoft Knowledge Base on the
article identifier (ID).
Summary List for Microsoft Project Version 4.1a|
155244 | PRJ41: MS Project 4.1 Will Not Run On Windows NT 4.0
| 137846 | PRJ41: Can't Change Paper Size Running Under Windows NT
| 155239 | PRJ41: Cannot save to SQL version 6.5
| 145573 | OFF7: Post To Exchange Folder Command Fails
| 148360 | PRJ41: Negative Numbers Converted to Positive with Save To Database
| 145853 | PRJ: Using Format/Bar May Cause Bad Formatting to Appear | 155159 | PRJ41: Resource Calendar Ignores Base Calendar Exceptions | 155238 | PRJ41: Updating Project With Workgroup Message Hangs WOW | 155247 | PRJ41: Wrong Variance Costs Between $21,474,837 and $42,949,017 | 155260 | PRJ41: Many Direct Cell Formats May Cause Hang | 155264 | PRJ41: Resource Reports Which Use a Filter May Crash | 155335 | PRJ: How to Configure Microsoft Project Workgroup Messaging with Lotus Notes | 155332 | PRJ41: Cannot Save a File Back to The Same Database |
Modification Type: | Major | Last Reviewed: | 9/26/2003 |
---|
Keywords: | kbinfo KB155398 |
---|
|