Workgroup Mail Stops Responding If Schedule Plus Runs Minimized (133109)
The information in this article applies to:
- Microsoft Windows NT Workstation 3.5
- Microsoft Windows NT Workstation 3.51
- Microsoft Windows NT Server 3.5
- Microsoft Windows NT Server 3.51
This article was previously published under Q133109 SYMPTOMS
If you start the 32-bit versions of Microsoft Mail and Schedule Plus from
the Startup program group with Schedule Plus configured to Run Minimized,
and return to the Windows NT desktop from a screen saver, Mail
intermittently stops responding (hangs) for a short period of time.
WORKAROUND
To workaround this problem, disable the Run Minimized option for Schedule
Plus program item properties, log off, and log back on as the same user.
STATUS
Microsoft has confirmed this to be a problem in Windows NT versions 3.5
and 3.51. We are researching this problem and will post new information
here in the Microsoft Knowledge Base as it becomes available.
Modification Type: | Major | Last Reviewed: | 12/16/2003 |
---|
Keywords: | KB133109 |
---|
|