Internal Task Ordering with Timex Data Link Watch (130435)
The information in this article applies to:
- Microsoft Schedule+ for Windows 7.0
This article was previously published under Q130435 SUMMARY
When you export tasks from Microsoft Schedule+ to the Timex Data Link
watch, task priorities 1 through 9 have a higher priority than task
priorities A through Z.
For example:
If you export only those tasks with a priority greater than or equal to C,
tasks 1 through 9, as well as A through C, will be exported to the watch.
- Create three tasks with differing priorities, say 2, C, and D.
- On the File menu, choose Export. Then choose Timex Watch.
- Clear all the boxes except Tasks, then choose Next.
- Select Tasks with a priority greater than or equal to C.
- Click Finish.
The result is that two tasks with priorities of 2 and C will be exported.
MORE INFORMATION
The Timex Data Link watch is manufactured by Timex, a vendor independent of
Microsoft; we make no warranty, implied or otherwise, regarding this
product's performance or reliability.
Modification Type: | Major | Last Reviewed: | 5/21/2001 |
---|
Keywords: | KB130435 |
---|
|