Scheduler Overwrites Package Property Information (122382)



The information in this article applies to:

  • Microsoft Systems Management Server 1.0
  • Microsoft Systems Management Server 1.1

This article was previously published under Q122382

SYMPTOMS

After Scheduler processes a job on a package, the package information is written back into the original database overwriting any changes that were made to the package properties by the Administrator.

For example, when the Scheduler reads and compresses a package, it may take a long period of time, depending on the size of the package. During the same time, the Administrator may be changing the properties of the package. This information is overwritten when Scheduler completes the process.

CAUSE

STATUS

Microsoft has confirmed this to be a problem in Systems Management Server version 1.1. This problem has been corrected in Systems Management Server version 1.2.

Modification Type:MinorLast Reviewed:6/14/2005
Keywords:kbDatabase kbnetwork kbScheduler KB122382